Account
My Items
OR
Used to secure the position of rebar during concrete pouring.Unit: BAG1C
Used to secure the position of rebar during concrete pouring.Unit: BAG1M
Acorn International Bar Tie, Wire Size: 17 ga, 8 in L, Steel, Includes: 1M Bar TiesUnit: BAG1M
Used to secure the position of rebar during concrete pouring.Unit: BAG5M
Replaces old, loose or popped gutter spikes. No pre-drilling, 500 hrs dacrotized coat and low profile head. Note, each blister card includes ten screws, ten 5 in plastic ferrules and one #3 square...
Replaces old, loose or popped gutter spikes. No pre-drilling, 500 hrs dacrotized coat and low profile head. Note, each blister card includes ten screws, ten 5 in plastic ferrules and one #3 square drive bit.Unit: CD 10
Secures batt-type insulation in place between joists. Chisel cut ends dig into joists for permanent holding. Easy to install in hard-to-reach crawl spaces. Pushes into place. Overall length is 1/2...
Secures batt-type insulation in place between joists. Chisel cut ends dig into joists for permanent holding. Easy to install in hard-to-reach crawl spaces. Pushes into place. Overall length is 1/2 in less than over center joist spacing. 13 ga.Unit: BX100
Secures batt-type insulation in place between joists. Chisel cut ends dig into joists for permanent holding. Easy to install in hard-to-reach crawl spaces. Pushes into place. Overall length is 1/2 in less than over center joist spacing. 13 ga.Unit: EA
Used for securing wood and metal forms to the ground in all flatwork applications, for attaching screed bard holder clamps, for securing landscape timbers, surveying stakes, string line guides and...
Used for securing wood and metal forms to the ground in all flatwork applications, for attaching screed bard holder clamps, for securing landscape timbers, surveying stakes, string line guides and more.Unit: EA